Choose one consistent activity base and use figures from the same period. The rate can be per labour hour, machine hour, unit or pound of direct labour cost.

User-selected dates and amounts; no tax-year ratesUnited Kingdom; arithmetic is the same in all four nationsReviewed 15 October 2026

Your figures

Example values shown

Replace the example with your details, then calculate.

£
base units
base units
£
base units

Your inputs stay in this browser. No account needed.

BEHIND THE NUMBERS

How this calculation works

Predetermined rate = budgeted overhead ÷ budgeted activity. Absorbed overhead = rate × actual activity. Over-absorption = absorbed − actual overhead; a negative result is under-absorption. Job allowance = rate × job activity. A direct-labour-cost rate is displayed as a percentage.

Worked example

£10,000 over 1,000 hours gives £10/hour. Actual 1,200 hours absorb £12,000, £1,000 above actual expenditure. A 50-hour job receives £500 overhead.

Example result: £10.00

Set the rate before measuring recovery

Using actual overhead divided by actual activity would erase the recovery variance. A predetermined rate preserves the comparison with the budget.

Interpret the sign

Over-absorption means the costing system charged more overhead than was spent; under-absorption means it charged less. Neither is cash profit on its own.

Assumptions and rounding

  • The same activity measure is used in every activity field.
  • The chosen base is suitable for the overhead pool.

Questions about this calculator

Can I use direct labour cost?

Yes. Enter pounds in all three activity fields. The rate is then expressed as a percentage of direct labour cost.

Should I mix machine and labour hours?

No. Use one activity base for a pool, or calculate the pools separately.